Case study introduction
- Man-hour cost reduction - Ownership
cost savings - Material
cost reduction
Annual man-hour cost reduction
Annual man-hour reduction, due to reduced scheduled locomotive
out of service time, accomplished a cost savings of close to $4 million
CAD. This was achieved by implementing a pro-active maintenance system
that included but was not limited to the following:
|
optimized line shop locomotive
schedule maintenance, |
|
target maintenance, |
|
integration of line shop / main shop
preventive maintenance, |
|
standardization of maintenance documentation
and contents, |
|
rapid transfer of new and up-to-date
maintenance changes to the line shops, and |
|
fingertip availability of current and
up-to-date "How To" maintenance directives. |
|